Overview of the project
Client: Consortium for the treatment of wastewater of Gäu-Ammer
Client testimonial
Client: Municipality of Nordwalde
Project: upgrading of the tank crest with a stainless steel scraper track for two secondary sedimentation tanks / non-stop operation even in winter, without the need for additional electrical energy or manpower.
Download (PDF, 94,29 KB)Client testimonial
Client: Consortium for the treatment of wastewater of Altensteig
Project: renovation of concrete and installation of a stainless steel scraper track as well as of a light-proof gutter cover and of the innovative Krumme no-freeze system.
Download (PDF, 1,18 MB)Overview of the project
Client: Consortium for the treatment of wastewater of Taubertal
Client testimonial
Client: Weserbergland company for wastewater treatment
Project: renovation of scraper tracks and installation of a heating system, inclusive of renovation of side wall concrete, on four secondary sedimentation tanks.
Download (PDF, 152,74 KB)Client testimonial
Client: Consortium for the treatment of wastewater of Fulda
Project: concrete renovation and lining of the track at Fulda Ovest.
Download (PDF, 141,20 KB)Client testimonial
Client: Degrémont S.p.A., Milan
Project: scraper track renovation on secondary sedimentation tanks in the Milano San Rocco wastewater treatment plant and relating additional works.
Download (PDF, 127,07 KB)Overview of the project
Client: Azienda Pluriservizi Macerata S.p.A.
Project: Renovation works on the tank crest and installation of stainless steel scraper track on the secondary sedimentation tank of the waste water treatment plant in Villa Potenza – Macerata
Download (PDF, 47,37 KB)