Overviews of projects

“Despite the many heavy snowfalls that hit the northern Black Forest area last winter, for the first time we can say that we had no scraper downtime in the two secondary sedimentation tanks.”

Tobias Weiß, Technical manager, the Altensteig wastewater treatment consortium

“Our plant technician is enthusiastic because now he can stop constantly worrying about the scraper’s 24 h operation, as was the case in previous years - not even in winter! Another important aspect is that the new Friedrich Krumme GmbH system works entirely without additional energy consumption. After this totally positive experience, all I can say is ‘buy it’ to other water treatment plant operators.”

Mr. Menzel, Treatment Plant of the municipality of Nordwalde

“Krumme installed this scraper track more than two decades ago. Since then, the scraper has been working perfectly, without any problems. I would choose it again at any time.“

Mr. Bartonitschek, Director of the wastewater treatment plant of Blomberg

“Fortunately, during the on-site work, all of the objectives and deadlines were complied with. The works were then successfully completed with a final testing. This is also thanks to the exemplary equipment, tools and materials used by the Krumme technicians.”

Samuel Baier, Director of the water treatment plant, Consortium for the treatment of wastewater of Gäu-Ammer

Dismantling of the rack-rail

Overview of the project

Client: Consortium for the treatment of wastewater of Gäu-Ammer

Since June 2016, the Gäu-Ammer plant has been using a Friedrich Krumme GmbH scraper track
Download (PDF, 495,25 KB)

Winter operation without heating

Client testimonial

Client: Municipality of Nordwalde

Project: upgrading of the tank crest with a stainless steel scraper track for two secondary sedimentation tanks / non-stop operation even in winter, without the need for additional electrical energy or manpower.

Download (PDF, 94,29 KB)

Winter operation without heating

Client testimonial

Client: Consortium for the treatment of wastewater of Altensteig

Project: renovation of concrete and installation of a stainless steel scraper track as well as of a light-proof gutter cover and of the innovative Krumme no-freeze system.

Download (PDF, 1,18 MB)

Long-term experiences

Overview of the project

Client: Consortium for the treatment of wastewater of Taubertal

Since 20 July 1999 the water treatment plant of Röttingen has been using two Friedrich Krumme GmbH scraper tracks.
Download (PDF, 151,69 KB)

Concrete renovation and scraper track lining

Client testimonial

Client: Weserbergland company for wastewater treatment

Project: renovation of scraper tracks and installation of a heating system, inclusive of renovation of side wall concrete, on four secondary sedimentation tanks.

Download (PDF, 152,74 KB)

Concrete renovation and scraper track lining

Client testimonial

Client: Consortium for the treatment of wastewater of Fulda

Project: concrete renovation and lining of the track at Fulda Ovest.

Download (PDF, 141,20 KB)

Concrete renovation and scraper track lining

Client testimonial

Client: Degrémont S.p.A., Milan

Project: scraper track renovation on secondary sedimentation tanks in the Milano San Rocco wastewater treatment plant and relating additional works.

Download (PDF, 127,07 KB)

Track disassembly

Overview of the project

Client: Azienda Pluriservizi Macerata S.p.A.

Project: Renovation works on the tank crest and installation of stainless steel scraper track on the secondary sedimentation tank of the waste water treatment plant in Villa Potenza – Macerata